Under CWA Section 404, a permit is required for the discharge of dredged or fill material into waters of the United States. Many bodies of water, including wetlands and streams, are considered waters of the United States and are subject to the Corps' regulatory authority.
People also ask
A. There are generally two types of activities which require a permit from the Corps of Engineers. The first includes activities within navigable waters.
The Corps has many general permits, which authorize minor activities without the need for individual processing. Check with your Corps district regulatory ...
However, some general permits may require review of the proposed work by district engineers before the project proponent can begin construction of the project.
Nov 28, 2023 · But when is an Army Corps of Engineers permit required? It is required for activities that involve the discharge of dredged or filled ...
Who is required to obtain a permit from the U.S. Army Corps of Engineers? Any individual, company, corporation or government body planning construction or ...
Under Section 10, a permit is required for work or structures in, over or under navigable waters of the United States. Under Section 404, a permit is required ...
For US Army Corps of Engineers: Mail a original of the completed Joint Application form , one set of original, reproducible permit application drawings, one set ...
A Section 10 Permit is required for most structures, such as docks, piers, bulkheads, and mooring piles, proposed in navigable waters of the US. A Section 404 ...